Skip to content
Field worker

Defects, parts and follow-up work

Declan Byrne · Last updated 10 Nov 2026 · 2 min read

Who this is for: field workers.

What you will learn: how to report a fault without losing the commercial or safety follow-up.

Defect or note?

Record Use it for
Note A conversation, a decision, a small observation
Defect A fault that needs action, parts or a return visit

If it could injure someone, stop production or cost the customer money, it is a defect.

Record a defect

  1. Open the job.
  2. Go to the defects section.
  3. Choose the asset and, if relevant, the task.
  4. Choose a category (mechanical, electrical, fire, refrigeration, general).
  5. Describe the fault factually.
  6. Choose severity: low, medium, high or critical.
  7. Record the operational impact.
  8. Record the immediate action you took.
  9. Set the equipment condition and whether the asset is still available.
  10. List parts required.
  11. State whether follow-up work is needed.
  12. Attach a photo.
  13. Save.

Severity guide

Severity Meaning Example
Low Cosmetic or non-urgent Missing label
Medium Needs planned follow-up Worn seal, slow leak
High Significant impact or risk Pump unavailable, circuit isolated
Critical Immediate danger or total loss Exposed live parts, fire system disabled

Parts

When you use a part:

  1. Add it to the job lines.
  2. Set the quantity.
  3. Add a note if the part is a substitute.
  4. Tell the office if the price or part number is wrong.

If you need a part you do not carry, record it on the defect and tell the dispatcher. Do not promise the customer a date you cannot meet.

Follow-up work

A defect can create a follow-up job. Link it so the office can see:

  • the original job
  • the asset
  • the defect
  • the parts and skills needed

The follow-up job carries the history forward. The customer does not have to explain the problem again.

What to tell the customer

Keep it plain:

  • what you found
  • whether it is safe to use
  • what you did
  • what happens next
  • who will contact them

Do not speculate about cost. The office quotes the work.

Check your understanding

  1. When is a note not enough?
  2. What four things make a defect actionable?
  3. What should you tell the customer before you leave?

Related: Working a job · Time, expenses and availability

Was this helpful?

Did this answer your question?