Skip to content

Case workflow

A day in the life of a field worker

Start-of-day checks, three jobs, a parts question and a receipt from the van.

The situation

The engineer starts the day with a paper list and a phone that may or may not have signal. The office wants updates, the customer wants an arrival time, and the parts question is urgent.

The workflow

Step 1

Start the day

Complete the start-of-day check and the vehicle walk-around.

Step 2

Open the first job

The job package has the site, access notes, asset and checklist.

Step 3

Work through the visits

Accept, capture evidence, get signatures and note the parts used.

Step 4

Ask the office

Send a message in the job thread when a part is not on the van.

Step 5

Close the day

Complete the end-of-day check and upload the receipts from the van.

Features used

Field worker app

Checklists

Instant messaging

Signatures and photos

Receipt OCR

What happened

The first job is a boiler service at a managed office. The engineer has the access code, the plant room location and the previous service sheet before leaving the depot. The second job is a call-out where the customer is not on site; the signature is captured from the building manager by phone. The third job needs a part that is not on the van, so the engineer sends a message from the job thread. At the end of the day, the van receipts are photographed and queued while the engineer is still in the yard. None of it needs a trip back to the office.

Walk through this with your team

Book a demo and we will use your sites, jobs and paperwork.

Book a demo

More from the field